https://www.selleckchem.com/pr....oducts/noradrenaline
9±101vs. 4.9±10.9 days; p=0.04) and mean cost for 3-day PVEM is less (INR 8311±9021vs. 30,371±17,563; p 0.0001) in public as compared to private hospitals. There was a negative correlation between cost of PVEM and the waiting period (r=-0.386; p=0.01). Safety practices are similar in public and private hospitals. Although practices in EMUs in India vary widely, they are comparable to those in developed countries. India has severe shortage of EMUs and long waiting lists for affordable PVEM. Altho