https://www.selleckchem.com/pr....oducts/pf-05221304.h
16-2.96 m, with a root mean square error of 0.93 m. The design capacity of the check dam is 33.6× 104 m3, and the actual capacity is 36.7× 104 m3, with an absolute error of 3.1× 104 m3 and relative error of 8.6%. The results prove the validity of the proposed calculation method; moreover, this study shows that the new method is accurate, easy to operate, and highly efficient for visualizing the spatial distribution of the siltation depth behind the check dam. This work will help improve future engineering decisions, design strategie