1 day ago - Translate

https://www.selleckchem.com/
To address the difficulty of optimizing turbidity process with large inertia and long time delay, a twice-optimal control and construction pruning (TOCCP) strategy is proposed, which can be used to improve the fast stability and strong robustness of industrial process. The new approach owns the advantages of twice optimal control (TOC) and construction pruning (CP) method. The TOC constructs an infinite-dimensional state observer of the system, which can eliminate the influence of time delay on the system. The CP is adopted to improve the mid-band damping o