https://at13387inhibitor.com/u....ltrasound-guided-fas
In the 1st group, three synchronous reactors (A1, A2, and A3) were run at 30 °C for 30 days. The powerful analysis indicated that sequentially reducing heat to 20, 15, and 10 °C had significant adverse effects on nitrate-loading rates. In the second group, two categories of parallel reactors were run at 30 °C (B1 and B2) and 15 °C (C1 and C2) for 45 days. Tall TN removal efficiencies (95%) had been attained in every four reactors, with comparable nitrate running rates muc